Mount Washington Resort, Bretton Woods, New Hampshire
Members of our staff were chosen by the Mount Washington
Resort to assist projects that included systems and facility upgrades
to be integrated with the existing conditions.
Our personnel assisted the Resort with the design and
implementation of the project to upgrade the existing wastewater treatment
facility. The upgrades include a third lagoon, as well as new aeration
equipment and appurtenances in conformity with secondary standards for
all three lagoons.
Additionally, our personnel assisted with the project
to replace the existing slow rate spray irrigation system serving the
Resort with a subsurface disposal system installed beneath the Mount
Washington Golf Course, a system which now allows the Resort to operate
on a year-round basis.